The Navy Aircraft Needs Additional Critical Testing

For those who commented on my previous posts please see the extracts below.


06-10-2013

The program manager for Maritime Surveillance Aircraft (the program manager) effectively addressed the potential risks and flight hour concerns of the DOT&E at the LRIP. However, as discussed below, additional critical testing should be completed before the full-rate production (FRP) decision.
The program manager planned the FRP decision review to occur in July 2013, before testers complete testing needed to demonstrate that the P-8A Poseidon airframe can meet life expectancy requirements. The program manager delayed life expectancy testing in reaction to funding constraints and testing priorities. The program manager also did not correct known system deficiencies, about which the DOT&E and Joint Interoperability Test Command officials had expressed concern, before conducting Initial Operational Test and Evaluation (IOT&E). This occurred because the Chief of Naval Operations accepted the risk of granting the program manager temporary waivers from correcting the deficiencies to allow the program to enter into IOT&E, while not having to fully correct the deficiencies until after the FRP decision. Finally, the program manager deferred completing mission testing in response to fleet commander concerns regarding maintaining on-time delivery of the P-8A Poseidon aircraft.


We recommend that the Under Secretary of Defense for Acquisition, Technology, and Logistics award an additional low-rate initial production lot for the P-8A Poseidon aircraft in July 2013 and defer the full-rate production decision for the P-8A Poseidon program until the program manager for Maritime Surveillance Aircraft demonstrates: the airframe can achieve the required 25-year lifespan without succumbing to structural fatigue; testing has resolved mission limited deficiencies; and the aircraft can perform its primary missions, including anti-surface warfare.


Perhaps you are too close to the programme and need to step back and look at the bigger picture.

Whilst the platform may perform well at low level, but is it robust enough to do this for 25 years!

Interesting that it has not proven it can carry out its primary missions!