Five years ago we had such trouble with the EC120 spares situation so it doesn't look as if things have changed. Had to get high authority to take a skid set off the production line as we were told there were none spare in the world. took six months overall, if we had been commercial operator we would have been dead.
Bell service is a million times better but we preferred the EC120 over the Bell product. You win some you lose some.