engine Wear & Tear
Thanks for the replies - we operate CBS4 &5s. This particular one (CBS5) is the quickest to cool down - usually both engines below 150 inside 30 mins - the other 4 all take at least 45 mins to 1 hr to reach that temperature.
Anyway luckily we have a good stck of spares and are changing the turbine as we speak!