The Northwest joined operationally; ie, being tasked through the NPAS control room, using NPAS callsigns, operating the NPAS shift system and manning levels from Jan 4th. We come under NPAS from a legal point; ie, Ops Manual,PAOM etc from the 29th.
And yes, there was a manning problem in the first week.
Don't believe all you read in adverts.
Last edited by MightyGem; 13th Jan 2013 at 15:23.