PPRuNe Forums - View Single Post - QEC 777 Roller Engine chg
View Single Post
Old 3rd February 2003 | 08:33
  #5 (permalink)  
sevenforeseven
 
Joined: Nov 2002
Posts: 241
Likes: 0
From: planet earth
a340-300 engine change takes about 12 hrs,using the good old bootstrap method,very easy to do,engine usually requires idle power check start as they come pre tested.Fuel line Hyd line and about 5 other disconnects not a bad job at all,which is all the better because the amount of engine changes you do on these aircraft sure builds up your experiance.
sevenforeseven is offline