PPRuNe Forums - View Single Post - A320 FAMILY ENGINE START SQUENCE
View Single Post
Old 16th Nov 2012, 10:01
  #8 (permalink)  
guclu
 
Join Date: Jan 2005
Location: ISTANBUL
Posts: 81
Likes: 0
Received 0 Likes on 0 Posts
For IAE engines time between valve close and gray background disappear is 20 seconds.

If you have access to Airbusworld you may donwload the Operating Procedure for Cost Saving presented by Airbus (themselves) at the 16th performance and operations conference.

In the presentation they say it is possible. Interesting.
guclu is offline