PPRuNe Forums - View Single Post - Merged: Boeing Revises 787 First Flight and Delivery Plans- Again
Old 19th Feb 2012, 02:03
  #297 (permalink)  
moutere101
 
Join Date: May 2010
Location: Canada
Age: 90
Posts: 32
Likes: 0
Received 0 Likes on 0 Posts
Take Five...

The 789 has not been built so how can it be overweight? Boeing are ahead of the self imposed schedule to get the over weight out of the 788 by Line # 90 and with the 789 at something like Line #130 there is no reason why it should not come in on weight. From PIANO-X calculations based on a 126t DOW it will haul a 280 seat passenger load 8000nm. For a 7000nm ESAD sector, which is about SYD-LAX-SYD it will haul the same passenger load plus 9t of cargo.

Last edited by moutere101; 19th Feb 2012 at 11:02. Reason: correct an error
moutere101 is offline