Inbound crew reported a fault with the R1 service door which didn't need reporting! The door was just a bit stiff to open so because it was entered into the tech log a TOM engineer had to drive over from Manc to sign the tech log!
Whilst waiting nearly 2 hours for the engineer to arrive the 76 was moved up onto stand 23 to allow the Ryanair onto stand 8.