Hamburg
According to Notams the surfacing should be finished by mid-August but nightwork will continue until mid-September presumably to instal the runway lighting after the surfacing. BD is showing to remain closed until Sept.
Taxiway Alpha past the AVP has been "bumpy" for a long time. I don't think it's included in the runway works but I'm sure it won't be too long before it's sorted.