Do you guys use PANS-OPS over there for specifying minima requirements? i.e. When viz is forecast to be less than 5000m, or less than 2000m more than the required viz for that approach, (which ever is the greater of the two) and/or cloud base less than 1000 feet above MDA/DA then an alternate is required.