My previous operator had a Enroute Terrain Clearance Program you followed that was part of the flight plan if the route had sections above the SE ceiling.
It was something along the lines of "if before VOR ABC, turn around, if after VOR ABC, but before XYZ, go to MNO, if after XYZ, continue."