I work in Maastricht and the way we do it is that the first sector controller needs the passing level to verify the mode C . Subsequent sectors don't verify it as they trust that the first sector has done the correct check. I believe this is pretty standard
So you only need to give the level when changing control centres would be the short answer ( or when asked
)