cat a operations
ec-135t2+ for clear heliport
tomorrow i`ll post bk info
DEFINITIONS
- Takeoff Decision Point TDP . .20 ft130 KlAS
- Landing Decision Point LDP 80ft 40 KIAS/
300 RD < 500 fl min
8.2. LiMlTATiONS (IN ADDITION TO THE LIMITATIONS GIVEN IN PART A, "GENERAL")
8.2.1. CERTIFICATION CRITERIA
The definition given below are related to the respective emergency and normal procedures
- A surface level heliport, certified for day and night operations, with
minimum field size of a minimum field length defined by the takeoff and landing distances
of this chapter and a minimum field width of 15 m.
Last edited by skiper-choper; 23rd December 2010 at 20:26.
Reason: improvement info