PPRuNe Forums - View Single Post - Sikorsky S-92: From Design to Operations
View Single Post
Old 7th Dec 2010, 04:19
  #1948 (permalink)  
Variable Load
 
Join Date: Feb 2001
Location: Sometimes here, sometimes there
Posts: 440
Received 6 Likes on 3 Posts
OFBSLF,

I thought this was common knowledge, but obviously not! However the Phase II and Phase III MGBs are not really "new MGBs", just new casings. The Phase III is effectively the same casing that was designed for the heavier CH148 Cyclone.

My prediction for the future - there will be a totally new MGB released in the next 2-3 years.
Variable Load is offline