J3 - don't confuse residual risk with mitigated risk.
Mitigated risk means that there are processes and procedures in place to reduce the risk. (i.e. 12 G limits in turns, strict selection criteria etc). This is the process of risk mitigation and there is no doubt this takes place.
Residual risk is the level of risk left AFTER mitigation. It is different for you, me and Matt Hall.
If it is acceptable to him (and it obviously is) let's sit back in our 1g armchairs and enjoy the flying! I certainly do.