PPRuNe Forums - View Single Post - Bad day at Manchester?
View Single Post
Old 26th May 2010, 08:39
  #31 (permalink)  
lightning boy
 
Join Date: Jul 2001
Location: UK
Posts: 1
Likes: 0
Received 0 Likes on 0 Posts
If the requirement is to have a more detailed runway inspection, lasting five minutes or whatever, to take place, wouldn't it make more sense to have two Ops vehicles to do the inspection. They could position themselves at either end of the runway and meet up in the middle, thereby reducing the delay to a/c by half. Just a thought.
lightning boy is offline