Work to start at the end of the summer......why does it always take LBA longer than necessary to start doing anything!!!!! this work was supposed to start early this year......Bridepoint need to pull their finger out, there is too much work needed at LBA, apron, runway, taxiway..ground radar...Come on Bridgepoint, get on with it...............