PPRuNe Forums - View Single Post - Questions for the UK
View Single Post
Old 28th Jan 2010, 22:29
  #21 (permalink)  
HS125
 
Join Date: May 2006
Location: On the right of the clowns and to the left of the jokers
Posts: 307
Likes: 0
Received 0 Likes on 0 Posts
SERIOUS POINT:

Dont forget the correct phraseology when transferring to the first frequency after departure, i.e:

1. Callsign of station adressed
2. Your Callsign
3. Passing Altitude
4. Cleared Altitude (or Level)
5. SID Designation (or alternative instruction e.g. Rwy hdg)

AFAIK That used to be audited as to how many departures complied.

OTHER POINT.

Under british engineering terminology, I believe the term for a valve through which a liquid flows is a COCK.

Shakes *clean* hands

Jeff
HS125 is offline