This has been discussed before.
The initial cost of the equipment, the space it occupy's, the fuel used carrying it, and the maintenance cost's towards running it......by far outway's the cost of the tread loss off the re-moulds!!
Although, with intense flying programmes surrounding e.g ryanair's 738's...maybe something like that would be viable.
Boffins...??