Secret Squirrel
You state what youy believe to be the case but the question I asked was what would be an acceptable solution? The company plans at the moment placve less emphasis on LGW as a base for what could be called mainline flying. I presume this means there is a surplus of engineers at LGW. The guys at LGW are striking in protest but presumably have a set of demands to end their action?
Bear in mind I am not trying to stir trouble and actually have sympathy with the poor way in which engineering has/is being treated within BA.