PPRuNe Forums - View Single Post - AF Asks DL to Assess Safety Issues
View Single Post
Old 19th Sep 2009, 21:26
  #19 (permalink)  
grizzled
 
Join Date: Dec 2007
Location: Itinerant
Posts: 828
Received 79 Likes on 14 Posts
Me Myself:

You wrote, " . . . Thou shall land mid-runway in the middle of storm and over run it so you can end up a mess in front of CNN"

I'm not sure if you are saying that you think the crew on that day (AF358, YYZ) were "screwing the pooch", but if so, you are wrong. That accident -- like most -- was the result of many factors, including everything from AF SOP's, ATC procedures, YYZ Airport Authority procedures, Wx, comms, training (including AF, Nav Canada, and YYZ Airport Authority training). Holes were lining up in that particular cheese long before that day. A lot more started lining up in the 30 mins before the accident. By the time the aircraft was on final, dozens of holes were lined up and ready . . .

Grizz
grizzled is offline