PPRuNe Forums - View Single Post - Newport Engineering and Qantas
View Single Post
Old 3rd Jul 2009, 06:16
  #3 (permalink)  
Short_Circuit
 
Join Date: Sep 2007
Location: Up left - Down right
Posts: 946
Likes: 0
Received 0 Likes on 0 Posts
We have no problems building a bridge, most have. Only problem is we built it too long because the "Buggery Campaign" blurred the plans. The bridge was built 1000 klm long and it proving long and difficult to "get over it".
It just doesn't seem to be worth the effort to try. (because the buggery campaign lives on)

Last edited by Short_Circuit; 4th Jul 2009 at 04:46.
Short_Circuit is offline