411A
I agree with you regarding TriStar L-1011 Autoland Fail Safe System. Have done the Autoland with the "Goldwire Wire Check" (Scheduled Maintenance Program) from G/S capture to Flare then to Rollout and it does llike it should be. Perfect simulation of CAT III.