Citabria's a fun little aeroplane, highly recommended. Got mine done in 2.1hr. I think it would have taken much longer if it had been a more challenging tailer, like a Cub or something.
Best tailwheel/basic aeros endorsement I ever heard of was 1.7hr VDO. Airswitch was something like 1.4hr.