PPRuNe Forums - View Single Post - British Airways - 2
View Single Post
Old 1st Aug 2008, 12:09
  #378 (permalink)  
HZ123
 
Join Date: Sep 2002
Location: Middlesesx
Posts: 2,075
Likes: 0
Received 0 Likes on 0 Posts
From BA staff website

Capacity will reduce by 6.4 per cent against the original plan. The majority of the winter capacity reductions are to the airline’s shorthaul network — including the suspension of four destinations from Gatwick — while the number of flights to some longhaul routes will also be reduced.

The four Gatwick shorthaul services to be suspended from October 26 are: Poznan, Sarajevo, Dresden and Newquay. New Gatwick routes to Valencia and Porto, which were planned to launch in October, will no longer start. Services to Hyderabad have been delayed until December 6.

On the face of it these cuts represent very little savings in real terms and maybe the calm before a blizzard..

Frankly VLC was a non runner at the otset being served from the UK daily x 35
HZ123 is offline