SINGAPURCANAC, I would draw your attention to the iaa/dublin threads here at the moment. The failures of the system are so frequent, that confidence has been lost.
The extent of this is that currently, 4 days after the Thales Eurocat sat down (twice!!!) the system is still operating on a reduced capacity. This is for fear that it will sit down again.
Safety first, but who do you think is to blame?