Does anybpdy know what the plans to extend the terminal are?
The plan is to turn the SE pier into a double sided international pier with more widebody stands than the current cul-de-sac has.
I have no idea of a timescale or if any detailed plans have even been drawn up yet, although I think there was something along those lines in the masterplan from memory?