PPRuNe Forums - View Single Post - MANCHESTER - 5
Thread: MANCHESTER - 5
View Single Post
Old 2nd Jun 2008, 06:58
  #2646 (permalink)  
WincoDinco
 
Join Date: May 2006
Location: The Mainland
Posts: 15
Received 0 Likes on 0 Posts
Originally Posted by A330ETOPS
Demolition of older buildings, such as old storage buildings, to the east of Terminal 3 has already begun. This is to make way for a new apron and taxiway towards runway 23R/05L, and an eastwards extension of Terminal 3, which is planned to provide an extra fifteen covered stands. A full length parallel taxiway may also be added to the second runway and more crossing points added across the first runway to improve ground movements of aircraft. Passenger flow on Terminal 1's gating piers is due to be realigned, with plans to redesign the piers such that departures and arrivals do not contraflow on the same level, allowing for larger seating areas at the gates, express retail outlets and a dedicated lounge and gating area for future Airbus A380 flights. Terminal 2 is due to receive a major extension, to encompass current remote stands to the west. Up to an extra eight covered stands will be made available by this. An airside link for transferring passengers between Terminals 1 & 2 is at the planning stage, designed in an effort to boost Manchester's chances of becoming a major hub airport. There is uncertainty as to whether this link should provide extra stands for the two terminals, or merely exist as a transfer corridor.

As you know, all existing terminals are undergoing a retail and airport security refurbishment programme, with Terminals 1 and 3 due to be complete by spring 2009, and Terminal 2 by autumn 2009. The security control areas are undergoing upgrades of new X-ray machines and passenger authenticity control systems, which will ensure a higher and faster passenger throughput, whilst improving the already elevated levels of security at the airport. The new security control areas are due to be complete and in use by late April 2008 in Terminal 1 and early July 2008 in Terminal 2.

The current fire station on the north of the airfield is becoming outdated and expensive to maintain and is also in the way of future apron and taxiway developments, so it is also stated that this may be demolished and a new facility built close to the original fire station site. A third runway and a Terminal 4 or satellite terminal may also be developed, however any such expansion would be subject to major public inquiry, and neither is currently accounted for in the airport's plans to 2015.

The taxiways are undergoing a phased renewal programme. Work on taxiway Alpha has recently been completed, and runway crossing point Delta Zulu is being resurfaced. The 'South Bay' stands at the end of B Pier recently closed to make way for a realigning of part of taxiway Juliet to allow the accommodation of the A380. The work also fits in with the airfields future taxiway strategy.
Great copy and paste from Wikipedia, A330.
WincoDinco is offline