PPRuNe Forums - View Single Post - Merged: QANTAS/ALAEA EBA
View Single Post
Old 17th May 2008, 05:36
  #1218 (permalink)  
wanty
 
Join Date: Jan 2005
Location: melbourne
Posts: 256
Likes: 0
Received 0 Likes on 0 Posts
If QE management are stupid enough to bring in an 8 hour shift, let them. They can do it anytime they want. Don't worry about having threats hanging over your head.

MH tried that one in Perth, it was he who backed down not the LAMEs.

LOL Let them bring in the 8 hour shift,I'll spend the first 20-30 maybe 40 mins of every day logging on to the company emails.First up,do password resets,15 minutes. Next log on and get an up to date thourough understanding of any and all read and signs and continuos training.

****,sorry boss,did I cause a delay to the pushback,I'm sorry(NOT)

Better fill out the delay report- (30 minutes)

8 hour shift, lol, bring it on.

****,is that my next aircraft thats been standing off at the gate for the last 30 minutes.
wanty is offline