PPRuNe Forums - View Single Post - DXB Radar vectoring 7th /8th
View Single Post
Old 22nd April 2008 | 10:11
  #60 (permalink)  
futr-kofeshop-dweler
 
Joined: Feb 2006
Posts: 39
Likes: 0
From: The Land of Red Light Tulips (NOT!!)
Ok, add this to after my until:

"the Tower Works, the Runway Works, EK Scheduling, and the lack of a Flow Management System."

I'll let publishing the notam slide tho

Back ta bed, sorry!
futr-kofeshop-dweler is offline  
Reply