PPRuNe Forums - View Single Post - DXB Radar vectoring 7th /8th
View Single Post
Old 10th April 2008 | 14:11
  #18 (permalink)  
VoxPopuli
 
Joined: Nov 2006
Posts: 62
Likes: 0
From: Delphi
As you (UAE ACC) are perhaps unable to cope...
The fact is mate that we are unable to cope, simple as that. That is why we institute a flow restriction. If you obtain some form of perverted satisfaction to see a fellow controller go under and have a reduction because of your action, then I pity you.

You are after all unable to cope with our massive amount off arrivals in the evenings and early mornings. But do we scream and shout and spit like infants? No, we stick them in the hold and to hell with anybody who complains about fuel. Then we give you the required inbound spacing, be it 15 or 20 or 30 nm. So why do you find it so difficult to give us the required outbound spacing? Why does it take 6, yes six phonecalls and a fax to get you to comply with the required MAXMO flow? Is your TWR controller dyslexic or incompetent or both?

Always remember that we can see all your traffic, inbound and outbound, because either we put them their or we are going to receive them. You on the other hand do not see all our traffic. Their is a bigger world out their than your bit of airspace. AUH never has a problem with flow, neither does Doha, they just comply.

Is it really so hard to comply with our flow or are you just being obtuse?
VoxPopuli is offline  
Reply