PPRuNe Forums - View Single Post - HyperMerged: Q Engineering LAME EBA VIII/Industrial Strategies
Old 30th Dec 2007, 11:30
  #639 (permalink)  
Clipped
 
Join Date: Mar 2002
Location: Oz
Posts: 381
Likes: 0
Received 0 Likes on 0 Posts
2% aggregate

What is the montary value of this extra 2% aggregate that is so sticky?

Well lets say the average LAME is a grade 9 ie. $1484/week.
2 percent = 29.68/week multiply that by 52 = 1543.36/annual now multiply that for 1700 LAMEs = $2,623,712.

In the grand scheme of things, that is f..k all, or one-third of Dicko's bonus share allocation for his marvellous contribution to aviation.
Clipped is offline