PPRuNe Forums - View Single Post - HyperMerged: Q Engineering LAME EBA VIII/Industrial Strategies
Old 22nd Dec 2007, 07:05
  #310 (permalink)  
acslame
 
Join Date: Apr 2007
Location: AUSTRALIA
Posts: 176
Likes: 0
Received 0 Likes on 0 Posts
Gents,
Whatever way you look at it the resume.com offer
is pure strikebreaking .
That is all.
They are relying on LAME's not caring about anyone else
except themselves. You will be used to break the assn
and the membership. You will be seen buy your old workmates
and it wont be a warm reception.
Now you may say that it serves the ACS boys right for not
backing up the heavy guys when they got made redundant,
however the real blame lay with the old executive and
there failure to act until it was way to late.
Don't take your anger out on the people who
are still there and taking the fight up to the company

This is not a school yard fight.
This will be the real deal and whatever comes of it, there
will be pain on both sides.
If you are worried about losing 4 hrs pay then I suggest you go
away and have a real hard think about what is going on.
4hrs is the least of your problems.

You are making a stand for your job
The whole of engineering is so rundown that we really are at a crisis
point. If you don't see a similarity to what happened to heavy then
I suggest you open you eyes.
We have to get these clauses dropped.
If they want to set up a joint MRO with MAS then they
will do regardless.
You don't just sign a MRU overnight because your workforce
voted to take industrial action do you.
THEY ARE PLANNING IT ANYWAY! these things take a load of planning
and to announce it now just shows that it has been in the
pipeline for months.
Everything this management do is designed to break us,
erode pay, conditions and create disharmony.

Tools they will use on us.
They will lie (surprise, surprise )
They will threaten you with dockings and being stood down,
some legal, some not.
They will threaten to send work offshore, they already do!
They will threaten to give the 330/787/380 work away!
Bottom line is QF engineering will do whatever they want to
supposedly save a buck!
They are liars and cheats
They are the ones who created this mess.
All we did is whatever they told us to, and look at the
state of things now.
QF engineering is getting close to being a bloody disaster by the day.
If you think its bad now, Imagine the cluster f**k its going to be soon.
So whatever you do, don't come in as a strike breaker.
Let us fight these clowns before it is too late !!!!!!!!

Last edited by acslame; 22nd Dec 2007 at 10:59. Reason: grammer
acslame is offline