PPRuNe Forums - View Single Post - Shackleton/Nimrod Stage 2 & ACT
View Single Post
Old 16th August 2007 | 13:35
  #16 (permalink)  
PingDit
 
Joined: Jun 2007
Posts: 744
Likes: 1
From: In the workshop, Prune-whispering.
The aerial & transmitter at NLF St. Mawgam was for 'Linepost' transmissions on CH9. It sent out calibration signals for the AQA5(M). It was represented as differing dB level signals used to work out Median Detection Ranges (MDR's) on acoustics.

PingDit
PingDit is offline  
Reply