I also am amazed that a failure in one location (apparently in an office building) caused loss of power supply to all three terminals.
Whoever did the electrical circuit design must have had to do it on the ultra-cheap with no redundancy or other consideration of maintaining supply. This is straightforward Building Services power circuit design, especially in such a significant structure as a major airport.