Hi guys, thanks a lot for your input. I guess the contractor will only install the radar we require. Since we have no radar experience (I worked as a radar controller many years back) and that we are working in a procedural environment, we need to tell the contractor what our ATC requiremenst are. I guess it will be difficult for the contractor to determine that. I still need to look at those two links provided, but I guess that will give us enough info