I think the problem in Aberdeen is more of a spares issue than unreliability, takes days for anything to arrive ! with the Puma not a pitch link bearing, the actual pitch change mechanismbearing at the end of the shaft, I think the shimming of the end cap (which is critical) was incorrect.