PPRuNe Forums - View Single Post - LEEDS
Thread: LEEDS
View Single Post
Old 20th Sep 2005, 06:43
  #901 (permalink)  
PTH needs tarmac
 
Join Date: Nov 2003
Location: Japan
Posts: 96
Likes: 0
Received 0 Likes on 0 Posts
Leodis,

Where on the 1st floor is security to be relocated to? There doesn't seem to be much of the current floor area free to be replaced by all the security equipment? The current ground floor security area is certainly getting far too small to cope with peak demand.

Re Terminal frontage. It seems barely a year or two since it was last done and the drop-off road has been rerouted so many times I've lost count. How can it be brought out any further? Or why didn't it get done "properly" last time?

There are still a couple of walls in the terminal from the last set of works that seem rather temporary, possibly indicating a deliberate long-term plan of development. However, it's difficult to see how each period of work builds together to produce a larger and more efficient terminal. Too much of it seems to replace earlier parts in a haphazard way. Perhaps my imagination just isn't good enough to envisage it all.

PTH
PTH needs tarmac is offline