I thought Heathrow had no night time traffic for noise reasons, so it would hardly be very neighbourly to open a building site all the time the aircraft are not flying.
Isn't the type of structure being used at T5 supposed to reduce (not eliminate) the use of cranes over long periods by making sure that as much as possible was done on the ground before major structures were positioned?