Originally Posted by
Central Scrutinizer
For that reason we changed from
"PF - GO AROUND FLAPS 20" as one call-out to
"PF - GO AROUND" "PM - [READ FMA]" "PF - FLAPS 20" "PM - SPEED CHECKED-FLAPS 20, THRUST SET, POSITIVE RATE" etc.
Why is the term "Speed checked" a company requirement? I would have thought it was normal airmanship to check the airspeed before actuating a flight control lever where applicable