PPRuNe Forums - View Single Post - Latest Boeing News
View Single Post
Old 28th Apr 2024, 01:15
  #116 (permalink)  
Commander Taco
 
Join Date: Sep 2007
Location: Canada
Posts: 163
Received 8 Likes on 4 Posts
Originally Posted by SRMman
Deliberate deviation from drawing during manufacture, fitting, assembly, which obviously would include use of excessive force, missing/incorrect size shims, takes the component or structure into unknown territory and not covered by the pre-certification testing.
That forms the basis of the whistleblower’s allegations. As a post-production engineer with responsibility to ensure that the finished product meets both the pre-production build and the pre-production certified standard, he alleges that the aircraft do not meet those requirements.

Last edited by Commander Taco; 28th Apr 2024 at 01:46.
Commander Taco is online now