PPRuNe Forums - View Single Post - AUKUS
Thread: AUKUS
View Single Post
Old 19th Apr 2024, 06:22
  #1587 (permalink)  
ORAC
Ecce Homo! Loquitur...
 
Join Date: Jul 2000
Location: Peripatetic
Posts: 17,538
Received 1,671 Likes on 768 Posts
What is the planned size of the Australian production hall?

If it’s similar to that at Barrow it would hold 3 subs in construction - one finishing build, one mid-build and one starting. Assuming a 10-12 year build time that’s one entering service every 5-6 years, which with a 30 year life would be able to maintain a fleet size of 5-6 boats.

An experienced team might get that down to 8 years - the current time to build a Virginia class, rolling one off the stocks every 4 years, which would maintain a fleet of 7-8 boats.

After that you are looking a hall/line able to build 4 at a time.


ORAC is offline  
The following 2 users liked this post by ORAC: