PPRuNe Forums - View Single Post - U.K. NATS Systems Failure
View Single Post
Old 29th Aug 2023, 12:52
  #73 (permalink)  
CBSITCB
 
Join Date: Mar 2016
Location: Location: Location
Posts: 59
Received 0 Likes on 0 Posts
Originally Posted by WB627
With infrastructure that critical, there should be a second FO cable with a completely different route to Swanwick and a different entry point into the building.
There is a redundant communication path.
CBSITCB is offline