PPRuNe Forums - View Single Post - Engineering Challenges Facing New VTOL Aircraft
Old 20th May 2023, 17:15
  #9 (permalink)  
wrench1
 
Join Date: Oct 2006
Location: USA
Posts: 753
Received 24 Likes on 19 Posts
Originally Posted by JohnDixson
So, how does this get done? Or, does it need to be done?
From my understanding it depends on the integration of the FBW. For the Bell 525 FBW the FAA issued Special Conditions to its certification basis under Part 29. See below. I also believe for the AW609, its flight control certifications will be dealt with under the new Powered-Lift category's certification requirements which has been described as a collection of existing Part 23, 25, and 29 requirements. However, my info is a bit dated on the 609.
Special Conditions: Bell Textron Inc. Model 525 Helicopter; Fly-By-Wire Flight Control System
wrench1 is offline