Originally Posted by
selfappointed
Reckon extending the present tram line from YMEN to YMML could be a cost affective and viable option to consider in the short term. Not for everybody but sure many would take advantage of such a service.
Timetable for route 59 shows ~45min to YMEN probably another 10 min to YMML. About the only time the bus has taken so long for me was when the B200 crash at YMEN blocked the freeway and we went via the ringroad.