The problem being France only produces a LEU reactor, not HEU, bringing us back to the need to refuel every 5 years and being dependent on France for refuelling - which is not an acceptable risk.
If you want a sub with a reactor fuelled for its service life you need HEU, which leads you back to US/UK reactor design and supply - even if the rest of the sub is built in Australia.