Originally Posted by
tartare
Not sure that new news in any form, the plans have always been the nuclear plant and engineering would be built somewhere else, shipped to aus then mated with the rest. The actuall % could be new info considering collins something like 60% local, I think 60% local on a nuclear would be completely unrealistic