Originally Posted by
triadic
As it is an ASA proposal it has to go to the OAR.
But why is it an ASA proposal? Who are trying to appease or please, or was it a ruse so that they could approve RIS. (we wanted to use our surplus ATCs to change the airspace architecture but the Industry torpedoed that, now what to do with the surplus ATCs, = RIS)