Originally Posted by
L1649A
With Airbus having a production facility in Mobile, would a variant of the A321 (suitably adapted) be eligible to compete to replace the VC-32 ?
I started this thread while back as replacement not just the 32 but, also E-6 and E-4 which is the requirement and a NEAT idea,
E4B/E6/C-32B replacement is a NEAT idea
cheers