Originally Posted by
patplan
There were over 300 MAX aircraft in service prior to the grounding. Figure an average of 300 hours per month per aircraft, two engines per aircraft, that roughs out to 180,000 engine operating hours per month.
I doubt anyone is going to get to0 excited over ~1 shutdown per 180,000 hours on a new engine type. That's pretty good rate for a
mature engine type..